MegaTec can recover the total wasted electrical power from any gas turbine power station due to higher ambient temperature than ISO condition. The recovered power in Egypt shall be 10% : 15% of the station nominal output power (the higher the ambient the higher the recovered power). The gas turbine power stations in Egypt represent 52.4% of the total power stations, as per EEHC 2016 report (SC=7,845 MW, CC = 12,527 MW, GT = 20,372 MW & Total =38,857 MW). We customize the most economical solution for your power station based on our client financial capability and available technologies (Media Type Evaporative Cooler, Fog System, Chillers System, etc).
Advantages (المميزات) | Dis-advantages (العيوب) |
---|---|
Capacity Enhancement when most needed & most valuable (i.e. reduce capital cost , reduce electricity selling rate & increase revenue) – (زيادة القدرة الكهربائية الخارجة من محطة التوليد عند الحاجة القصوى لها وكذلك عندما يكون ذلك أغلى مبيعاً للمستهلكين). | Additional investment fund. |
Increased seller electrical power revenue, conserve fuel resources & increased fuel efficiency (زيادة إيرادات مبيعات الكهرباء للمستهلكين , وتقليل تكلفة إستهلاك الوقود , وتقليل معدل إستخدام الوقود لنفس القدرة المطلوبة). | Permanent power loss due to insertion ▲P. |
Pay-back within 7 years max. & Gas Turbine Life Extension (إسترداد النقود فى غضون 7 سنوات بحد أقصى , وزيادة العمر الإفتراضى للتوربين الغازى). | Increased Combined-Cycle (CC) Efficiency as well for simple cycle (SC). (زيادة كفاءة الدورة البسيطة وكذلك كفاءة الدورة المركبة أيضاً). |
Additional maintenance cost. | |
Reduced grid-wide emissions (SOx, NOx , particulates, CO2, particulates and hydrocarbons). | Additional space. |
MegaTec shall be your partner to newly install your pharmaceutical factory HVAC system as per international standard, resolve the chronic problems in any existing HVAC system and help you to get the required international certificate and/or license. Cleanrooms can be used in electronic manufacturing, Pharmaceutical, Automotive and Research Facilities.
The formal US Federal standard 209 (FS209) had been withdrawn in November 2001.
The cleanest cleanroom is ISO Class 1 and the dirtiest cleanroom is ISO Class 9.
Typical pressurization control techniques for Clean Rooms | |||
---|---|---|---|
Comparison Factor | DP control | DF control | Hybrid (cascaded) control |
How it deal with the differential pressure | It uses a pressure differential sensor to measure the pressure difference between a controlled room and an adjacent space (e.g., a corridor). | It assumes an offset value based on intuitive guesswork; this value is then used as a volumetric or mass flow difference between entering and leaving airflows through their airflow control devices. | It combines the pressure accuracy of DP and the stability of DF. The offset value (offset cfm) is resettable based on the pressure differential reading. The offset value reset schedule is predetermined, and the controller’s parameters are fixed manually in field (i.e. in this method the initial offset value (offset cfm) is fixed manually on site for each room). |
Suitability | DP control is suitable for a tightly constructed room with limited traffic. | This method is suitable for open-style rooms or rooms with frequent traffic. DF normally maintains the same offset value throughout operation to keep pressurization constant. A constant-percentage offset value (i.e. offset cfm percentage) is sometimes used, but this creates a weaker pressurization at a lower flow. | This method is suitable for applications which require a very precise air flow direction control (which represents the most important factor in contamination control). |
A constant-percentage offset value (i.e. offset cfm percentage) is sometimes used, but this creates a weaker pressurization at a lower flow. | |||
How it deal with the offset air flow rate | It basically ignores the specific offset value (i.e. offset cfm) as required; instead, it directly controls the airflow control devices to achieve the required pressure differential between the controlled room and an adjacent space. | It controls the required offset air flow rate only regardless of the differential pressure readings between rooms. | It controls the required offset air flow rate and the differential pressure readings between rooms at the same time. |
Additional required features | A door switch is recommended to trigger a reduced pressure-differential set point if the door opens. | Control circuit shall control the offset cfm only. | Control circuit shall control the offset cfm as well as the differential pressure between rooms all the time. |
Classification | IEST Recommended Air Change Per Hour (ACH) For Cleanrooms | Ceiling Filter Coverage, % | HEPA or ULPA Filter | |
---|---|---|---|---|
ISO Class | FS-209 Class | |||
9 | NA | No recommendations | 5 - 15 | HEPA Filter |
8 | 100,000 | 5 – 48 (20 ACH by FDA) | 5 – 15 | |
7 | 10,000 | 60 - 90 | 15 – 20 | |
6 | 1,000 | 150 - 240 | 25 - 40 | |
5 | 100 | 240 - 480 | 35 - 70 | |
4 | 10 | 300 - 540 | 60 - 90 | ULPA Filter |
3 | 1 | 360 - 540 | 60 - 100 | |
2 | NA | 360 - 600 | 80 - 100 | |
1 | NA | 360 - 600 | 80 - 100 |
MegaTec can fulfill the client's requirements such as required differential pressure between the adjacent spaces, cleanliness class, etc by proper design, installation, start-up and commissioning. Bio-safety level labs, Chemical labs, research labs, and animals Labs are some examples of the specialized labs.
MegaTec shall provide the industrial process cooling below the freezing water temperature, above the freezing water temperature and even above the standard chiller chilled water supply temperature, by properly design the process cooling system as per the process(s) requirements.
MegaTec can conserve energy by about 10% : 15% of the required power to any chilled water system, for the benefit of our clients, by using the most economical customized thermal energy storage (TES) system.
Industrial processes and/or equipments require special design requirements. These special requirements require qualified specialist and MegaTec team can fulfil efficiently these requirements.
If any client is suffering from particulate contamination (such as cement aerosol, PVC powder, cotton aerosol, etc), MegaTec can provide cost effective total solution to effectively eliminate the potential risk, based on our client's financial capability.
NoteThe gaseous and/or particulate contaminants can be founded in many industrial applications such as cement factories, foundries, lime Kilns, chemicals industries, plastic industries, asphalt production, bulk material marine transportation, pharma industries, and many other applications.
In case one of our clients encounters negative results from any gaseous contamination, MegaTec can efficiently eliminate the potential risk, based on our client's financial capability.
NoteThe gaseous and/or particulate contaminants can be founded in many industrial applications such as cement factories, foundries, lime Kilns, chemicals industries, plastic industries, asphalt production, bulk material marine transportation, pharma industries, and many other applications.
High rise buildings (300 ≥ tall building > 100 m, 600 ≥ Supertall Building > 300 m and Megatall building > 600 m in height as per ASHRAE) has a unique and formidable challenges to design, install, start-up and commissioning.
Healthcare electromechanical systems (HVAC, plumbing, FF, etc) require a special expertise. For example HVAC system in any healthcare facility requires differential pressure between some spaces in order to eliminate infection. This challenge can be done efficiently by MegaTec team.
Many HVAC systems are suffering in the market now from many chronic problems due to improper design and / or selection. The clients of these systems are also suffering and paying more money and cannot find the qualified team to permanently resolve these chronic problems. In this case MegaTec shall resolve your HVAC system chronic problem with warranty, using the most economical solution, advanced instrumentation, latest software program(s) if needed and very qualified engineers.
MegaTec can recover the wasted energy to maximize the HVAC system efficiency and reduce the operating system cost.
One of the most advanced HVAC systems is the district cooling and heating system. This system is used now in USA and European countries and represents 50% of the total HVAC systems capacities. This system (with the help of TES) is imposed by Emirate of Dubai due to the tremendous benefits of this advanced system.
Industrial & manufacturing clients are driven by unique production/process that requires one-of-a-kind design solutions for each project. These facilities house special machinery, equipment or process which often require regulated environmental conditions and specialized systems. MegaTec’s professionals have an average of more than 20 years' experience serving these clients, our in-house capabilities enable us to provide our clients with innovative, integrated, and environmentally friendly engineering systems. As an engineering firm in Middle East, our engineers naturally have experienced many industrial HVAC projects in their design and execution careers. With industry expertise, MegaTec focuses on helping clients in a sustainable fashion, by creating systems that will operate efficiently, mitigate risk, and reduce costs and waste. We create value-added solutions for clients in a variety of facilities such as:
Industrial Localized Exhaust System (Air Washer & Air Oasis) – Jeddah Private Factory KSA
bulk chemical synthesis, tablet, injectable and oral packaging, barrier isolation/containment, automated processing and bio-pharmaceutical R&D facilities.
With client’s mission in mind, we deliver innovative, cost-effective solutions that translate into a measurable competitive edge for our customers. Our project success can be measured by technical superiority, adaptability, constructability, reliability, maintainability, safety and energy efficiency.
In each of our established markets, our experts have the intimate knowledge of the unique building types and special issues that are relevant to our clients. These experienced engineers eliminate the learning curve, sharing their knowledge and leading teams to deliver successful client-specific results. Our mission is to customize project solutions for our clients, tailoring a wide range of service offerings with marketplace expertise.
Today’s corporate and commercial facilities are critical investments with vital connections to business bottom line. We work with architectural partners to provide code-complied, reliable, good indoor air quality, flexible for changes and energy-efficient engineering systems to create comfortable workplaces that enhance end-user productivity. MegaTec offers MEP engineering services for projects ranging from small fast-track building renovation to large Fortune 500 headquarters facilities; from design-to-suit high-rise landmark buildings to developer-driven office buildings for optimized rental value. Our experience encompasses core & shell designs, tenant space fit-ups and whole building design. We offer smart-building options and integrated systems to enhance building intelligence, flexibility and make buildings cost less to maintain and operate. In addition to commercial buildings, we also have great design experience in public assemble facilities which are extremely diverse with respect to size and function. They can range from museums, conference centers, libraries, auditoriums to performing arts centers. Maintaining proper levels of temperature, humidity and sound, implementing advanced life safety, fire protection and security schemes, and designing highly functional and aesthetically pleasing lighting are frequently critical for these spaces.
Today’s colleges and universities often face many challenges in expanding and upgrading facilities for education, science and research: such as attracting new students and professors, minimizing disruption to campus life, replacing aging infrastructure and incorporating technology into classrooms, dorms and student centers. MegaTec engineers have extensive experience in higher education facility planning, design and construction. We have provided engineering and construction services for nearly every type of educational space including:
Our experience also features adjunct facilities such as central plants. In addition to large projects, our work also involves the small upgrades and renovations needed to keep facilities and equipment in good working order and/or to solve any chronic problems.
Understanding that international colleges and school systems face challenges of aging facilities, reduced funding and changing technologies, we concentrate on engineering strategies that matter most in schools today. Working with architectural professionals, we are dedicated in designing sustainable, cost effective and energy conservation solutions to create quite and comfortable learning environment. MegaTec engineers have completed many projects for colleges and school districts and private them (colleges and schools) in their design careers, from incorporating new technologies into classrooms, improving existing facilities, keeping up with the changing education environment, and to large new colleges and school planning, design and construction. Many of our designs feature highly efficient HVAC and lighting/daylighting systems that are also geared to improve the comfort and productivity of students and staff. Each project is approached with an understanding of the schedule constraints inherent in educational settings, such as planning for construction during summers and other colleges/school breaks.
TAB for any HVAC system shall be done as per NEBB (National Environmental Balancing Bureau) procedure. MegaTec utilize high degreed engineers to perform complex or large-scale testing tasks and prepare testing reports to ensure high quality of our work for our clients.
Project Title | Contract No | |
Tower | CHWP | Pump Model |
Served Area | Pump Serial No | |
Pump Manufacturer | Test Date | |
Readings By | Location: Doha, Qatar | |
PUMP DESIGN DATA | Power Supply | 415 V – 3 PH - 50 HZ |
Motor Kw, V, Ph, Hz | xx, 415 V – 3Ph – 50 Hz | |
Motor FLA / SF | ||
Motor RPM | ||
PUMP RPM | ||
Pump Flow Rate, gpm | ||
Pump Total Head, ft | ||
Impeller Diam, mm• | ||
PUMP TEST DATA | Power Supply (T1-T2, T1-T3 & T2-T3) | |
Proper Direction of Rotation of any Pump Impeller | (Must Be OK) | |
Motor Kw, V, Ph, Hz | xx, xxx V – 3Ph – 50 Hz | |
Motor FLA / SF | ||
Impeller Diam, mm• | ||
Pump RPM• | ||
Final Motor Drawn Ampere | ||
Final Pump Flow Rate, gpm | ||
Final Discharge Pressure, psi | ||
Final Suction Pressure, psi | ||
Final Pump Actual Total Head, ft |
MegaTec has its own standard control panel's details which support our goals achievement. Our team has the required advanced instruments and experience to properly analyze and solve any problem.